2001
INTRODUCTION The
College and BAEM have reviewed future manpower requirements for A&E
Medicine. Changes in the practice of our specialty and patients' needs,
coupled with the threat of large reductions in SpR numbers, have
prompted this process. The publication of the NHS Plan has thrown down
further challenges to the medical profession of changing the structure
and function of consultant work and service provision. Officers of CEM
and BAEM feel it is urgent that the specialty develops a coherent
workforce planning strategy.This document aims to stimulate discussion
and constructive comments are welcome. Officers of CEM and BAEM
believe that the previous "Way Ahead" recommendations are no longer an
option. This document has been agreed by officers of both
organisations, and we feel it is ready for wider discussion with
Fellows and Members. Please send comments to the College office.
SUMMARYA
detailed option appraisal considered four scenarios for the senior
medical staffing of A&E Departments to be achieved over 5-10 years.
BAEM and CEM officers consider that the previous 'Way Ahead' guidance no longer meets the challenges of the modern NHS.
BAEM and CEM recommend a radical option of increased 'shop floor' consultant presence, 12 hours a day, 7 days a week.
At least 8 full-time Consultants are required to work such a rota.
There should be different types of posts with a varying balance between
clinical and other responsibilities (i.e. managerial, teaching,
research).
The BMA should negotiate fair rates of pay for evening and weekend working.
OBJECTIVES
The vision of CEM and BAEM is:
To provide a first class Emergency Medicine Service within the framework of a coherent emergency system.
That patients will have access to a senior clinician (Consultant,
NCCGs, SpRs) at all times who will either provide the care or directly
supervise the care.
To attract, retain and motivate high quality staff.
To allow local flexibility where lower patient numbers would not
justify that senior cover should be provided exclusively by A&E
(however, the principle remains that patients should have access to
senior medical advice at all times).
FINAL DRAFT WORKFORCE PLANNING
BACKGROUND
The
last strategic review of medical manpower planning for A&E was the
BAEM document "The Way Ahead" (1998). When this document was drafted
the assumption was made that the A&E workforce would follow the
pattern of the previous 15-20 years, i.e. a service that was provided
mainly by Senior House Officers (SHOs) with Consultants providing
supervision, teaching and management skills for departments. It is
universally recognised that the creation of the A&E Consultant has
transformed a previously poor service. However the environment in the
NHS has changed even since 1998 and given the new NHS Plan the pace of
change is going to be even greater. This review will examine the
changes and the new demands that this brings to the practice of A&E
Medicine for Consultants and SpRs.
DRIVERS OF CHANGE
CLINICAL PRACTICE
Over
the past decade there has been an annual rise in absolute numbers and a
higher dependency of patients attending A&E departments. There has
been a steep increase in the numbers of medical emergencies attending.
The causes of this change are complex and inter-related but the
following facts may help explain this change:
Increase in numbers of elderly, especially very elderly, in the population.
Increase of numbers of elderly living alone in the community.
Increase in the use of the 999 ambulance service.
Decrease in acute hospital beds resulting in blocks to direct admission
Risk transfer (in an increasingly legalised and litigious society
individuals and institutions will seek to transfer risk to another body)
Increase in the number and complexity of time sensitive treatments for common acute conditions (e.g. thrombolysis)
Increase in the complexity of medical care in the community
All
of these factors bring more work to the A&E department. The
incidence of major trauma is falling, but the huge rise in medical
workload threatens to swamp many A&Es at times of peak activity.
CHANGE IN MEDICAL TRAINING
Major
changes in postgraduate training are coupled with an increasing
expectation that SHO staff should perform less of a service role (NHS
Plan). The fear of making errors and litigation is now a major factor
in the practice of many doctors. However, the inexperienced SHO faced
with the full variety and complexity of A&E medicine finds it
increasingly difficult to make decisions on their own. This requires
more senior advice and input.Another
major change is the increasing specialisation of hospital staff. For
example the Royal College of Surgeons of England has stated that it
feels that General and Orthopaedic surgeons no longer have the breadth
of training that allows them to look after patients with head injury.
There is a clear recognition that A&E staff have more skill in this
area (1). The specialty of A&E has matured with senior staff
recognised as experts in emergency medicine.
GOVERNMENT STRATEGY
This
has been set out in the NHS Plan and we await the publication of a
review of emergency care. However there are a number of clear messages:
- There
will be less dependence on SHOs for service delivery.There will be an
expectation of more "hands on" consultant work.There will be more work
undertaken by other health professionals.
- Waiting times in A&E will be cut dramatically.
The
Government has stated that it is determined to change the NHS. The main
objective has been to put the patient at the centre of planning.
EMPLOYMENT MARKET, LEGISLATION, EXPECTATIONS.
An
organisation's best asset is its workforce. The quality of an A&E
service is almost totally dependent on the expertise, commitment and
motivation of the staff. The effects of changes in medical training are
discussed above but there are shortly to be major changes in the
arrangements for out-of-hours work for junior doctors. This may not
impact so much on A&E where the full shift pattern has been the
norm for many years but it will certainly reduce the availability of
junior staff in other specialties for out of hours work.There
is a shortfall in the number of doctors available. There are major
crises in nurse recruitment in almost every city. A&E work is hard,
has peak activity at antisocial times and is physically and emotionally
demanding. The A&E clinician has to think fast, be constantly alert
and very flexible. This makes it a challenge to the young who are
stimulated by the learning opportunities and the ability to make a real
difference to acutely ill patients. However it is recognised that shift
patterns, especially night shifts, become harder to sustain as
practitioners grow older. If the work patterns in A&E are seen as
very unrewarding and unattractive, recruitment and retention of staff
will become increasingly difficult.There
are a number of legislative and political initiatives to make work more
family friendly. However A&E is a 365 day a year activity, often
with peak staffing requirements at unpopular times (weekends, nights,
public holidays). While there is no doubt that some flexible working
can help retain staff, there is an increasing recognition that every
one must play a part in the unpopular parts of any rota. The
key to proper manpower planning is to give staff enough incentive to
work unsocial hours. This is not necessarily financial. Many A&E
staff would cite staff shortage at weekend and nights as the main
problem in motivating people to work these shifts. The rest of society
places a premium on 'quality time' and this is reflected in increased
rates of pay for work in the evenings, at nights and weekends.
The
Government has indicated that it wishes to review the Consultant
contract. However negotiations have been taking place for two years
with little progress. Therefore this document uses the present
consultant contract as the basis of planning but acknowledges that this
may change. It is not the part of this document to enter into detailed
discussions over contractual matters but BAEM will seek advice from the
BMA.
WORKFORCE PLANNING OPTIONSOfficers of BAEM/CEM have appraised four options:
1. No change - To keep to the numbers of consultants recommended in "The Way Ahead" document.
2. To move to a consultant/senior supervised practice (at least 12 hour/day 7 days a week Consultant presence in the department).
3. To move to 24 hour consultant presence.
4.
A innovative solution similar to option 2 but with varying job plans
(Initial proposals were even more radical but were dependent on
renegotiation of the consultant contract).
MODEL 1 NO CHANGE
Present recommendations
The
service is SHO based with some middle grade service provision and
supervision. It is consultant led (supervision/training/management with
service input into review clinics and some new patient work, heavy on
call commitment,)
Recommended
staff levels are outlined in the "Way Ahead" document. A typical
department seeing 60,000 new patients per annum would have 4
Consultants and 17 "service equivalents". At present this might include
two SpR, two staff grades and a variable number of SHOs (should be 15)
Obviously few departments come up to these standards, but then few
departments can provide the quality of service that we would want for
patients.
| | | |
| 2001 | 490 | 300 |
| 2002 | 535 | 300 |
| 2003 | 590 | 290 |
| 2004 | 635 | 245 |
| 2005 | 680 | 200 |
| 2006 | 725 | 165 |
| 2024 | 760 | 130 |
| 2008 | 795 | 105 |
| 2009 | 795 | 115 |
| 2010 | 795 | 125 |
Advantages
This
model has worked moderately well in the past and departments with this
level of staffing have been able to return reasonable quality.
Sustainable in the short term.
Disadvantages
'No
change' is not on the Governmenta's agenda. We cannot recommend a 'no
change option' which will jeopardise the specialty's future and not
enhance patient care. Training,
experience, Government policy and clinical governance issues all point
to a change in the role of the SHO from service to training.
Society and Government policy indicate the need for greater consultant input.
If this model is accepted, the numbers of Consultants needed would
result in a cut in SpR numbers with only 15 new posts from 2005. This
would mean many departments would have no SpRs, and that the service
and supervisory role currently undertaken by SpRs would need to be
filled by either more Consultants or expansion of the staff
grade/associate specialist grade.
This model is
not sustainable in the longer term. There are increasing demands on all
experienced staff for supervision but also for an increasing proportion
of new patient work.
Large numbers of other staff would be needed to take up service shortfall.
Doubt about availability of increased numbers of high quality Staff
Grade doctors willing to do a lot of out-of-hours/night shifts
Opinion: We cannot recommend this model as it is not sustainable in the longer term.
MODEL 4 - INNOVATION
As
the Government's agenda is to radically change the NHS, then we foresee
that a radical change will be needed for consultant contracts. The
present Consultant contract has served the NHS well although it is
recognised that the great majority (95%) of Consultants work well in
excess of their contracted hours. Previous studies have shown this to
be 53 hours for all specialties and in a recent survey of A&E
consultants, an average of 68 hours per week. Such workload is only
sustainable with a professional flexible contract. All indications are
that the government wishes to have a much clearer contract.The current
contract is based around a "session of 3.5 hours" with 11 sessions per
week. In the past 5-7 sessions have been regarded as "fixed" and the
others flexible, often one session being allowed for on call
commitments.In A&E the move to have fixed 'shop floor' sessions is
becoming necessary in many departments as is the need for out of hours
and weekend cover. Many departments are trying such systems but it is
clear that with only three consultants it is difficult to provide
anything other than 9-5 Monday to Friday cover. Larger departments work
some out-of-hours shifts but these are locally negotiated.A radical
change to the consultant work pattern would require a major overhaul of
the consultant contract, but this will take time for the BMA to
negotiate. While we would like to use 4 hour sessions and defined rates
of pay for out-of-hours work, we feel initially we must work with
existing contracts and terms and conditions of service. However, some
principles need to be clear:
During
clinical sessions consultants would be present on the 'shop floor' and
would supervise junior medical staff, provide advice and support for
nurse practitioners and would see new patients.
There would be extra pay for work in the evenings and weekends (rates
to be negotiated). Night work should be unusual but should attract even
higher rates of pay and time off.
If a consultant works at weekends they must have time off the next week.
Consultant posts would not all have the same job plan. Some might have
more teaching/research/administrative roles. Basic payment would need
to be higher for those undertaking greater clinical roles given the
proportionally more time spent working evenings/weekends.
Examples
of job plans with differing roles are shown in table 2. Note: Roles may
change according to age, and pay is calculated using current BMA
recommendations for out-of-hours work but future pay is dependent on
BMA negotiations
Table 2: Consultant job plans with differing roles
| Type consult | Clinical session | Administrative | Other | Pay (sessions) |
| Clinical | 8 | 2 | 0 | 15 |
| Standard | 7 | 2 | 1 teaching | 13 |
| Teaching | 6 | 2 | 2 teaching | 12.5 |
| Research | 5 | 2 | 3 research | 12 |
| Admin | 5 | 2 | 3 admin | 12 |
In medium sized and large departments (40,000-60,000 new patients per annum and > 60,000 new patients per annum respectively)
In a medium sized department providing 12 hour a day, seven days per week cover the consultant staffing mix might be as follows:
| Type | Number | Number clinical session |
| Admin | 1 | 5 |
| Teaching | 2 | 12 |
| Research | 1 | 5 |
| Standard | 2 | 14 |
| Clinical | 2 | 16 |
| Total | 8 | 52 |
Annual/study/bank
holiday/duty leave requirements mean that at any one time two
Consultants will not be available for clinical work, thus reducing the
weekly available sessions to 40. There would need to be 5 sessions per
week for review clinics and if applicable 7 sessions for observation
ward work. This would leave 28 available clinical sessions (28 required
for 10.5 hour/seven day cover with 'double cover' for one session each
day or 14 hours per day single cover).This
would leave 28 available clinical sessions (7 days a week, 4 sessions
per day, each session being 3.5 hours). Since 4, 3.5 hour sessions
totals 14 hours a day, this could be worked in different ways:
1. consultants overlapping for 3.5 hours (double cover)
2. consultants working partial sessions to total 12 hours a day
3. consultants working without overlap for a total of 14 hours a day.
In any scenario the length of a clinical shift would need to be agreed.
Small departments (< 40,000 new attendances per annum)
Small
departments would not have sufficient workload to justify this model.
Local arrangements would need to be put in place to ensure that
patients have the same access to senior opinion. There would need to be
much more call on the inpatient teams to provide increased support to
A&E. In large hospitals the inpatient teams often are over
stretched and find it difficult to ensure a timely response. In these
departments there would be three consultants providing a Consultant led
service but with an on call service out of hours.
WORKFORCE PLANNING
It is clear that there will have to be very significant SpR expansion immediately if this model is to be achievable.If
Option 4 is adopted it will result in a need for 1,350 Consultants by
2010. This is based on 140 A&E Departments with 8 consultants and
60 with 3, and includes an allowance for academic posts and part-time
working. This would require an immediate expansion of the SpR grade
with SpR numbers reaching a peak of 700 by 2006.
Table 3: SpR numbers needed to achieve Option 4 Consultant numbers
| Year | yr1 | yr2 | yr3 | yr4 | yr5 |
| 2001 | 160 | 60 | 60 | 60 | 60 |
| 2002 | 160 | 160 | 60 | 60 | 60 |
| 2003 | 160 | 160 | 160 | 60 | 60 |
| 2004 | 160 | 160 | 160 | 160 | 60 |
| 2005 | 160 | 160 | 160 | 160 | 160 |
| 2006 | 100 | 160 | 160 | 160 | 160 |
| 2024 | 40 | 100 | 160 | 160 | 160 |
| 2008 | 40 | 40 | 100 | 160 | 160 |
| 2009 | 40 | 40 | 40 | 100 | 160 |
| 2010 | 40 | 40 | 40 | 40 | 100 |
Table 4: Comparison of Consultant and SpR numbers in Options 1 and 4
| year | opt1 cons | opt1 SpR | opt4 Con | opt4 SpR |
| 2001 | 490 | 225 | 490 | 300 |
| 2002 | 535 | 170 | 535 | 380 |
| 2003 | 590 | 130 | 590 | 460 |
| 2004 | 635 | 100 | 635 | 540 |
| 2005 | 680 | 75 | 680 | 620 |
| 2006 | 725 | 75 | 805 | 700 |
| 2024 | 760 | 75 | 930 | 700 |
| 2008 | 795 | 75 | 1055 | 600 |
| 2009 | 795 | 75 | 1180 | 500 |
| 2010 | 795 | 75 | 1305 | 400 |
Advantages
Move towards the vision of more responsive Consultant delivered service.
Much better access to senior opinion for patients.
Enhanced training and supervision for staff in training.
While all consultants are equal, the job plans differ.
Those doing more unsocial hours are paid more and have time off.
Increased support for Nurse Practitioner services to reduce need for referral.
Almost immediate impact on service due to SpR expansion but cost spread over 10 years.
Disadvantages
Move from normal Consultant contract. BMA advice needed.
Move from normal work patterns for consultants.
Increased financial incentives dependent on BMA negotiations.
OPINION.
We recommend this model as the best to pursue for the future and it
scored highest in the option appraisal. We emphasise that this option
must proceed 'hand-in-hand' with development in staffing levels
generally as described in the "Way ahead".
Summary
Option
4 scored highest in the options appraised. Option 1 was thought to be
non-sustainable. It would result in poorer access for patients to
senior opinions when they most need such help, it does not fit with the
government�s vision of a new NHS and it means SpR numbers would be
reduced to 50-75 (from current levels of over 300).
It
is clear that the recommended option will require a large increase in
resources for Accident and Emergency Medicine and that partial
implementation would be a major threat to its success. If the
government is unwilling to fund this expansion then it must revisit the
strategy set out in the NHS plan. BMA advice is essential.
June 2001
APPENDIX
MODEL 2
Consultant/senior supervised practice.
In
this model there would be an attempt to provide senior presence 24
hours per day, with increased numbers of consultants providing this
cover 12 hours per day 7 days per week. Other shifts could be filled by
SpRs, Staff grades or Senior SHO posts. In smaller hospitals there may
need to be other arrangements for the provision of experienced cover
out of hours. In
this model there would be much greater supervision of inexperienced
staff, although some departments may wish to move to a base where many
more experienced staff were providing the service (e.g. nurse
practitioners).
To
fulfil this model there would need to be at least 8 wte consultants.
These consultants would make a service contribution although the main
role would be supervision and management of complex cases. This would
allow a 1:4 weekend rota (a consultant cannot work a 8 hour day shift
and then be on call overnight, this would be unsafe. Therefore one
consultant would be in the department while the other would cover the
nights on call.) Given the need for prospective cover it is unlikely
that a more frequent rota would be sustainable in the long term. Consultants
undertaking evening and weekend work would expect enhanced payments for
this unsocial hours working. This would be in addition to time off in
lieu of such working.
Advantages
Patients have increased access to senior opinions.
More patients seen by fully trained permanent staff.
Starts to address many of the problems of the current system. Starts to
use other members of staff such as nurse practitioners.
Better training and supervision of SHO.
Senior medical back up for Nurse Practitioner service.
Allows 1:4 weekend rota with adequate time off for unsocial hours.
Allows 1:4 weekend rota for middle grades.
Gives recompense for unsocial hours working.
Offers choice if Consultants wish to work longer/more unsocial hours then this would be paid.
Disadvantages
Major change in Department staffing patterns.
Dependent on employing enough Nurse Practitioners and Staff Grades.
Nurse Practitioner remit more restricted on night shifts due to casemix.
Dependent on enough Consultants being available.
May not be cost efficient in smaller departments with insufficient throughput of cases.
(In such departments may need to revert to present style cover with senior on site advice coming from the inpatient teams).
Opinion:
While attractive this option scored less well in the option appraisal
in terms of Government acceptance and is not flexible enough and lacks
definition of the Consultant role.
Model 3
Consultant/ Nurse Practitioner provided service.24 hour, 7 day Consultant and Nurse Practitioner cover.
Advantages
Majority of patients seen by trained staff.
Training posts have much reduced service commitment.
Disadvantages
Huge increase in Consultants needed.
Would need huge increase in SpR numbers to train this number of Consultants.
Huge increase in Nurse Practitioners.
Very flat and in some ways top heavy staffing structure.
May be hard to achieve numbers of patients seen with these "unsocial hours rates".
Highly unlikely the Government would support the cost of this structure.
June 2001